Skip to main content
🏭 Factory-direct · Guangzhou Nansha, China · +86 138 2218 3778
Home›DC Charging Piles›Split DC Fast Charging Pile System 240 kW - 2400 kW
Split DC Fast Charging Pile System 240 kW - 2400 kW

Split DC Fast Charging Pile System 240 kW - 2400 kW

This split-architecture DC fast charging system pairs one or more power cabinets with dispensing piles, so charging power is pooled in the cabinet and distributed flexibly to every vehicle in session. Power cabinets are configurable from 240 kW up to 2400 kW, and each dispensing pile can be fitted with GB/T, CCS2, CCS1···…

  • CategoryDC Charging Piles
  • ModelCA-417
  • MOQ50 pcs (samples 1–5 pcs)
  • Lead timeSample 3–7 days · Bulk 15–25 days
  • ShippingDHL / FedEx / air / sea, worldwide
Automotive-grade process controlCE / FCC · test reports on request100% load tested

This split-architecture DC fast charging system pairs one or more power cabinets with dispensing piles, so charging power is pooled in the cabinet and distributed flexibly to every vehicle in session. Power cabinets are configurable from 240 kW up to 2400 kW, and each dispensing pile can be fitted with GB/T, CCS2, CCS1 or CHAdeMO connectors — one site, mixed fleets, one procurement line. The system supports OCPP for back-office integration and starts sessions by RFID card, QR code, POS terminal or PIN, online or offline.

Key Features

  • Flexible power distribution: cabinet power is pooled and allocated dynamically across active dispensing piles instead of locking one charger to one bay.
  • Configurable capacity: 240 kW up to 2400 kW in modular cabinet combinations — add cabinets as site demand grows.
  • Connector choice per pile: GB/T, CCS2, CCS1 or CHAdeMO, matched to the fleet you actually serve.
  • OCPP support for integration with mainstream charge point management platforms.
  • Four start methods — RFID card, QR code, POS terminal, PIN code — with offline start available when the network drops.
  • Four networking modes: WiFi, Bluetooth, LAN and 4G.
  • 18 built-in protection functions covering electrical faults, environmental ingress and user-side errors (see table below).
  • Multi-language display options for export markets, including English and Russian.
  • OEM/ODM: housing colour, logo, screen layout and payment configuration can be customised.

Specifications

ItemSpecification
ArchitectureSplit: power cabinet(s) + dispensing piles
System powerConfigurable, 240 kW to 2400 kW per site
Connector optionsGB/T / CCS2 / CCS1 / CHAdeMO (per pile)
Session startRFID card, QR code, POS terminal, PIN
NetworkWiFi / Bluetooth / LAN / 4G
Back officeOCPP support
DisplayMulti-language (English, Russian and others on request)
Protections18 functions (electrical, environmental, user-side)
Warranty2 years
CustomisationOEM/ODM housing, logo and payment options
CategoryProtection functions
ElectricalShort circuit, overvoltage, undervoltage, overcurrent, overload, overtemperature, leakage current, grounding, lightning, static, relay-stick detection
EnvironmentalWaterproofing, dustproofing, flame-retardant housing
Session and userAuto stop at full charge, emergency stop, connector lock anti-theft, control-pilot (guide) fault detection

Frequently Asked Questions

How many vehicles can one power cabinet serve at the same time?

It depends on the cabinet configuration and the connector count you order. Power is pooled in the cabinet and distributed dynamically, so several dispensing piles can charge simultaneously at the power each vehicle accepts; contact us with your bay count and vehicle mix for a configuration proposal.

Which connector should I choose for the dispensing piles?

Match the fleet: GB/T for the Chinese market, CCS2 for Europe, CCS1 for North America, CHAdeMO for legacy Japanese models. Piles can be ordered with mixed connector types on the same site. For adapter-level cross-standard charging on existing dispensers, see our DC adapter range.

Does it work with our charging management platform?

The system supports OCPP, which most charge point management platforms use for session control, billing and remote diagnostics. Confirm the OCPP version your platform requires with us before ordering.

What happens if the network connection drops mid-operation?

Sessions can start offline by RFID or PIN, and the four networking modes (WiFi, Bluetooth, LAN, 4G) give redundant backhaul options. Charging continues during a network outage and records are synced once the link returns.

Related pages: browse the DC converter range for cross-standard charging on existing dispensers, read the DC converter selection guide, or send us your site layout and fleet list for a charging pile configuration proposal.

Request a Quote

Tell us your target standard, current and quantity — reply within 24 hours.