Case
Product launches, factory updates and EV charging industry notes from Creative Amperex.
Charging Connector Handle Batch Production – Factory Photo
A batch of charging connector handles after moulding and surface finishing, lined up for contact installation. Batch production keeps qualit···…
Read more →
EV Charging Product Storage and Packing Area – Factory Photo
Packing and storage area for finished EV charging products. Cartons are labelled with model, serial number and destination port before conta···…
Read more →
Semi-Finished Charging Connectors in Production – Factory Photo
Semi-finished charging connectors with wiring waiting for final housing closure. Traceability labels on each unit link the connector to its ···…
Read more →
Connector PCB Assembly Line – Factory Photo
Cable and PCB sub-assemblies for charging connectors pass through inspection trays on the production line. This stage feeds the final connec···…
Read more →
PCB and Cable Assembly for EV Charging Connectors – Factory Photo
Control PCBs and cable harnesses for EV charging connectors are soldered and tested in-house. Every board is function-tested before it is fi···…
Read more →
Charging Connector Housing Assembly Line – Factory Photo
Charging connector housings moving down the assembly conveyor at the Creative Amperex factory. Housing halves are ultrasonically welded and ···…
Read more →
EV Connector Assembly with Terminal Pins – Factory Photo
A Type 2 connector during assembly: terminal pins are inserted and wired before the housing is closed. This step determines contact resistan···…
Read more →
Type 2 Charging Connector Handles in Production – Factory Photo
Batches of Type 2 charging connector handles moulded and trimmed on the production line. Each handle shell is checked for fit before the cab···…
Read more →
Charging Cable Assembly Work Area – Factory Photo
Work area where EV charging cables, plugs and connectors are weighed, inspected and prepared for assembly. Cable crimping and continuity tes···…
Read more →