What should be considered when purchasing heavy-duty integrated charging stations?

Views : 1070
Update time : 2025-05-04

When purchasing a heavy-duty truck integrated charging station, the following aspects should be considered:

Performance Parameters:

- Power: Choose based on the battery capacity of the heavy-duty truck and the desired charging time, typically ranging from 150 to 750 kilowatts. For frequent fast charging needs, select a high-power charging station with 320 kilowatts or more.

- Charging Interface: Ensure the interface type is compatible with the heavy-duty truck's charging port. Common standards include GB/T 20234.

- Output Voltage and Current: The output voltage range should be adaptable to the heavy-duty truck's battery system, and the current should meet the charging requirements. For example, a charging station with an output voltage of up to 1000 volts and a maximum output current of 500 amps can satisfy the charging needs of most heavy-duty trucks.

What should be considered when purchasing heavy-duty integrated charging stations?

Product Quality and Reliability:

- Brand and Reputation: Select well-known brands with good market reputation, such as Teledu or Xingxing Charging, which typically offer better guarantees in terms of R&D, production processes, and after-sales service.

- Protection Rating: Consider the operating environment of the charging station. Outdoor units should have a protection rating of at least IP54 to prevent dust and water ingress, ensuring safe operation in harsh weather conditions.

Safety Features:

- Protective Functions: The charging station should include over-voltage, under-voltage, over-current, leakage current, and short-circuit protection to ensure the safety of equipment and personnel during charging.

- Grounding Requirements: Proper grounding is crucial for the safe operation of the charging station. Ensure the grounding system meets relevant standards to effectively discharge any漏electric current.

After-Sales Service:

- Warranty Period: Choose products with a longer warranty period, typically at least 1-2 years, with some brands offering extended coverage.

- Technical Support: Inquire about the availability of timely technical support, including remote monitoring, fault diagnosis, and on-site maintenance, to ensure quick recovery in case of malfunctions.

Cost Considerations:

- Purchase Price: Prices vary significantly between different brands and power ratings. Compare quotes from various manufacturers to select a cost-effective option that meets your needs.

- Operating Costs: Consider energy consumption, maintenance costs, and potential site rental fees. For example, high-power charging stations consume more energy, so assess long-term operational costs comprehensively.


Related News
Read More >>
How long does it take to charge an electric car ? How long does it take to charge ···
2024-09-23
How long does it take to charge an electric car? In this article we will consider the time to charge for domestic charge···...
DC Fast Charging CCS type 2 plug DC Fast Charging CCS type 2 plug
2024-09-23
Shanghai Mida Electric Vehicle Power Co., Ltd. is a well-known brand that produces numerous electric vehicle products in···...
The high-voltage and high-current supercharging pile is the future development trend of the world The high-voltage and high-curren···
2024-11-22
Trend 1: V2G Technology and "virtual Power Plants"Virtual power plant is not a power station in the real sense···...

Leave Your Message